Paul C. Bunn Elementary

Youngstown City Schools • Youngstown, Ohio

Completed in the Fall of 2008, this $9 million school was completed as a joint venture of several local architects. The design allows for direct access to a courtyard that provides outdoor learning experiences.

This project was 68,000 sq. ft. of new construction. It serves a large population of special education students with a 7,000 sq. ft. gymnasium and a controlled outdoor “student garden” program.

 Design Awards:

• 2011 Honorable Mention, Interior of the Year, ASID, OH North Chapter